Wednesday, 27 March 2013

What is Retro- or Re-Commissioning?

Retro-commissioning is a procedure that can be applied to existing buildings to verify whether the main building systems are operating efficiently and as intended. The purpose of retro-commissioning may be to resolve problems that have developed during the building’s life, or to address building operating issues that may have never operated as intended. The value of continuous commissioning is to improve comfort, optimize energy use, identify potential retrofits for energy savings, and improve overall system control and operations for the building. Rather than a set of prescriptive measures, re-commissioning adapts to meet the specific needs of each building owner.  The re-commissioning process involves a comprehensive engineering evaluation that focuses on low-cost solutions to comfort and high energy use concerns. For continuous maintenance and assurance that a building’s equipment is running as efficiently as possible, it is recommended that buildings that have been newly commissioned or retro-commissioned go through a re-commissioning process every 3-5 years.
 
As part of our continuous maintenance program, Provident Energy’s Building Automation System clients enjoy continuous building system commissioning. For buildings that do not yet have a building automation system monitored by Provident Energy, a commissioning study may be something that could be considered. As part of its electricity demand reduction mandate, the Ontario government is now offering incentives for re-commissioning of existing building chiller plants. For more information and eligibility requirements please visit: www.saveonenergy.com. If you are interested in re-commissioning or building automation systems, please contact Provident Energy at 416-736-0630, ext 5.

Wednesday, 13 March 2013

Springfest Returns on April 18, 2013



Please visit Provident Energy’s booth (#318) at the annual SpringFest conference and tradeshow at the Metro Convention Centre on April 19, 2013. SpringFest is a free exclusive 1-day event that includes seminars, refreshments, and networking with 200+ exhibitors.
 
Talk to us about potential energy saving retrofits or book a free energy assessment of your building.
 
To register for the conference, please visit www.springfesttoronto.com
 
 
 
 

Wednesday, 6 February 2013

Free Energy Assessments

If your building is interested in energy efficiency retrofits, Provident Energy offers free energy assessments. The first step would be a site visit where Provident Energy will examine all common areas to indentify potential energy saving retrofits (lighting, mechanical equipment, etc). We will then send you a report which will outline the cost of the various retrofits (as installed by Provident Energy), the estimated energy savings, and the estimated incentive. This energy assessment and proposal is free. Please also note that all quotations are complete turn-key solutions: supply, installation, recycling, incentive applications, and project management by Provident Energy.
Some of our retrofit options include:
  • Building Automation Systems (BAS)/ Energy Management Systems (EMS) with 24-hour a day Energy Management System Monitoring
  • Variable Frequency Drive Installations on make-up air units, pumps, and cooling towers
  • Lighting Retrofits (corridors, garages, stairwells, etc)
  • Lighting Controls/Occupancy Sensors in Common Areas
  • CO Monitoring for Underground Garages
  • Individual Sub-metering Utility Systems (electrical, thermal, water)
 
If you are interested in this free energy assessment, please contact the retrofit sales department at info (at) pemi.com or 416-736-0630, ext 5 to arrange for a site visit.

Wednesday, 7 November 2012

Provident Energy is a Powerstream CDM Champion

Provident Energy is pleased to be featured as a Conservation Demand Management (CDM) Champion by Powerstream.

PowerStream is proud to recognize forward-thinking organizations that are making the saveONenergy conservation programs we offer a key part of their business development strategy. Each month, the CDM Champions site will profile a different contractor, consultant, distributor or manufacturer who has delivered results through the saveONenergy program.

For more information, please visit the Powerstream website.


Provident Energy Management ~ CDM Champion



Monday, 29 October 2012

Join us at the Condominium Conference on Nov 2 & 3!

Please join us at the Toronto Congress Centre on Nov 2nd and 3rd for the annual ACMO/CCI Condominium Conference.

Don’t miss this annual conference which incorporates two days of educational sessions for Condominium Directors, Managers and other Professionals working in the industry – with a two day trade show and numerous networking and social activities!

Please visit us at Booth #419
  • You can book a free energy assessment!
  • You can enter our raffle to win prizes!
  • You can ask us questions about energy saving retrofits!
For more information and to register, please visit their website: http://www.condoconference.ca/NEWS/index.php

Tuesday, 23 October 2012

We're Hiring!

We're looking for a Building Automation Technician to join our energy management systems department. For more information on the position, including how to apply, please see the job posting on our website.

Tuesday, 25 September 2012

Prime Time for Cooling Retrofits

With the impending cooler weather creeping upon us day-by-day, condominiums are prepping for changeover to heating. This is a prime time to consider the retrofit of the existing cooling tower to be controlled via Variable Frequency Drives (VFDs). After change-over has occurred, the cooling tower sits idle for several months until mid-spring, when changeover back to cooling takes place.

During this time VFDs, can be intertwined with the cooling tower without any effects on residents due to the cooling tower being dormant. A cooling tower operates off, low, or high to maintain the proper condenser water temperature. The fan motor is sized for the maximum load. A variable frequency drive can instead be used to exactly match the condenser load, saving energy in the process.

For more information or to arrange a free assessment to determine potential energy savings, please contact the sales department at Provident Energy at 416-736-0630, extension 5 or visit our website www.pemi.com